PROJECTS
CFB ESQUIMALT A/B JETTY
RECAPITALIZATION PROJECT
DEFENCE RESEARCH AND DEVELOPMENT
CANADA VALCARTIER RESEARCH CENTRE
Project Team: WestPro (Pomerleau) (construction manager –
demolition of the existing B jetty); Stantec (design authority for B Jetty);
Wood E&I (WSP) (design authority for A Jetty); Pomerleau (contractor
– B Jetty construction); Defence Construction Canada (project contract
management); Hanscomb (design engineer’s cost consultant for A
Jetty); Advicas (design engineer’s cost consultant for B Jetty); Golder
(WSP) (geotechnical studies/environmental engineering); Anchor
QAE (environmental advisor); Hemmera (environmental); HDR (risk
advisor); WSP (commissioning agent); Ruskin/CDI, RIC Power, Trotter &
Morton, Black & McDonald (subcontractors to Pomerleau); Englobe;
EY (management consultant); McElhanney; GeoVerra (site surveyor);
Turner & Townsend (cost consultant)
THE AIM of the A/B Jetty project is to demolish and replace the
old A and B jetties at CFB Esquimalt’s Dockyard, which were
constructed during World War II. The A/B Jetty project supports Canada’s National Shipbuilding Procurement Strategy,
which is delivering modern ships to the Royal Canadian Navy
over the next 30 years. The new fully integrated A/B Jetty
facility, to be completed by 2031, will be home to several of
these Canadian-built vessels, including the new Arctic/O昀昀shore Patrol Ship and Joint Support Ship, and in due course
the future Canadian Surface Combatant ships. The implementation of this $1.1 billion project has been advancing steadily
over the past decade and it currently involves three primary
contracts: one for the design and engineering work of the new
B Jetty, one for the design and engineering work of the new A
Jetty and one for the construction of new jetty facilities.
MCPL CHRIS WARD, IMAGING SERVICES, CFB ESQUIMALT (DND)
Project Team: EBC Inc. (contractor); Provencher_Roy; GLCRM
Architectes (architects); EXP (electromechanical); CIMA+ (structure/
civil engineering); Architecture49
THE INAUGURATION of the new Defence Research and Development
Canada (DRDC) Valcartier Research Centre (VRC) pavilion
complex marks the completion of a $166 million project. The
new 30,900 square-metre facility, which includes more than
80 new multidisciplinary laboratories, o昀케ces, and storage
spaces.
The VRC is a key component of DND’s science and
technology enterprise and one of seven DRDC centres
nationwide. It supports the Canadian Armed Forces (CAF)
through evidence-based advice and applied research in critical
defence technology domains, including information systems,
optronics, and combat systems science.
A three-phased major infrastructure renewal project at
Valcartier, worth $391 million, will see the construction,
in addition to the main complex, of a1,789 square meters
garage/shelter, the upgrading of 12 buildings, demolition of
49 buildings, and a landscape revitalization.
DND
20D—RENEW CANADA –DEFENSE SUPPLEMENT – NOVEMBER/DECEMBER 2026